Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Apr 22, 2020     Trim system - (2.3 hours)       Category: Electrical
1. Took delivery of my newly black powder-coated control sticks. Installed them to get a rough idea of how much length will have to be trimmed from the tubes, as well as the lengths of the wire runs that will be needed from the sticks to the terminal blocks..

2. Installed the two terminal blocks for the stick wiring. (The front cockpit will actually get one more small one, used for the starter-button wiring.)

3. Drilled and installed the Safety Trim box, underneath the rear seat.

4. Drilled and installed a few wire passthrough snap-bushings.

5. Installed a few Adel clamps that will support the trim wiring as it exits the control sticks and makes its way to the SafetyTrim box. The wiring will have to pass underneath both the right aileron pushrod and the elevator pushrod, so I had to plan carefully.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.